Arvin Subdivision spans 90 acres and is being developed for 191 lots. With over 170,000 CY of dirt moved and nearly 30,000 LF of pipe installed, it’s a full-scope sitework package from clearing to curb.
Durham, NC
Meritage
SCOPE OF WORK
Total Acreage
0
Cubic yards of dirt moved
20000
Linear feet of pipe
94000
Months
0
Key Scope Highlights
170,000+ CY of dirt moved across mass grading, pond excavation, topsoil work, and building pads
Nearly 30,000 LF of pipe installed across storm, sewer, and water systems
70 acres cleared on a 190-acre site, delivering full infrastructure for roads, utilities, and drainage
Project includes SCM pond excavation, townhome and single-family prep
Full Right Of Way improvements, including public road construction with curb, gutter, and asphalt and DOT tie-ins