Sewer, storm, and water installed by our own crews, on our own schedule. Underground is where a site plan meets reality, and it is one of the things Marks does best.

Sanitary SewerStorm DrainageWater DistributionForce MainPump StationsDetention Systems
Overview

Underground is where the schedule is won or lost.

Our utility crews handle the tough infrastructure. Sewer, storm, and water installs done right the first time, tied directly into the grading and roadway work happening around them.

From aerial sewer over wetlands to deep underground detention systems, we bring the experience to manage the complications that stop other crews cold, including blasting, rock, and pump station installs.

We have built strong relationships with municipalities and inspectors across the Triangle and Eastern North Carolina. Our crews coordinate seamlessly in the field to keep utility work moving safely, efficiently, and on schedule.

Marks Clearing and Grading utility crew assembling a valve and hydrant tee on a Triangle jobsite Reinforced concrete pipe staged on a Marks Clearing and Grading utility site Marks Clearing and Grading utility crew on site beside an excavator and trench box
Capabilities

What our utility crews install

Wet utilities are a core, self-performed part of the Marks scope, not a line item we hand off. Here is what our crews put in the ground.

Marks crew installing sanitary sewer main in an open trench, aerial view

Sanitary Sewer

Gravity mains, laterals, manholes, and offsite tie-ins, installed to municipal spec and inspected as we go.

Precast storm drainage junction box set and connected on a Marks jobsite

Storm Drainage

RCP and HDPE storm systems, precast structures, outlet protection, and the pipe network that makes the grading plan work.

Storm drainage pipe set in an open trench on a Marks jobsite, aerial view

Water Distribution

Water mains, valves, hydrants, and services, pressure tested and disinfected for a clean handoff to the utility.

Loader moving HDPE pipe for a force main installation

Force Main

Onsite and offsite force main runs, including long road crossings and the coordination that comes with them.

Utility structure being set by a Marks crew

Pump Stations

Wet wells, valve vaults, and pump station installs handled in house, with the deep excavation they require.

Deep underground detention excavation in rock on a Marks site

Detention Systems

Deep underground detention and SCM structures built to hold stormwater long after the site is turned over.

Complex Conditions

Built for the hard ones

Most utility scopes look simple on paper. The ones that are not are the reason contractors call us.

utility6
01

Rock and blasting

When the trench hits rock, the job usually stops. Ours does not. We plan for rock in preconstruction, coordinate blasting, and keep the pipe moving so the rest of the site is not waiting on one line.

Marks excavator installing pipe with a trench box on a Triangle development
02

Aerial sewer and wetland crossings

Aerial sewer over wetlands, stream crossings, and sensitive buffers all come with their own permits, access problems, and inspection schedule. We have run them enough to know where the delays hide.

Aerial view of deep utility installation on a Marks Clearing and Grading site
03

Deep cuts and detention

Deep sewer, underground detention, and pump stations demand real shoring, real dewatering, and crews who work safely at depth every day. That is normal work for our utility division.

We have built strong relationships with municipalities and inspectors, and our crews coordinate seamlessly in the field to keep utility work moving safely, efficiently, and on schedule.
Marks Clearing & Grading Utility Division
Featured Project

Magnolia Forest

A 57-acre KB Home development delivering 154 homes, with mass grading, roadway widening, and one of the largest utility scopes we have run on a single residential site.

Storm, sewer, water, and an offsite force main, installed alongside our own grading crews so no phase sat waiting on another.

26,500LF of Pipe
190,000CY Dirt Moved
57Total Acreage
154Lots
Aerial view of the Magnolia Forest development graded by Marks Clearing and Grading
Gallery

On the job

Utility work from active Marks sites across the Triangle and Eastern North Carolina.

Aerial view of a large Marks Clearing and Grading site with utility trenches open across the pad
Marks utility crew tightening a valve assembly
Excavator bucket working alongside a precast utility structure
Marks excavator and spotter setting pipe grade
Marks crew member connecting underground utility pipe
Marks utility crew and excavators working a site excavation
Manhole structure set in blasted rock on a Marks utility site
Marks excavators working an open utility trench
Aerial view of pipe staged for installation on a Marks development
Deep rock excavation for an underground detention system on a Marks site
Marks excavator backfilling a completed utility run
Large diameter water main and precast structure set in a deep Marks trench

Faith. Family. Excellence. The standard behind every project.

Ready to break ground?

Tell us about your site and we will show you what turnkey sitework done right looks like.