Skip to main content

Marks Clearing and Grading

Marks Clearing and Grading utility crew members holding certificates in front of a Faith. Family. Dirt. company truck

Underground Utility Contractor, Raleigh-Durham & the Carolinas

Built into the bigger picture.

The crews. The equipment. The coordination.

Storm drainage, sanitary sewer, water distribution, force mains and complex underground systems, installed by our own crews alongside our grading and roadway operations.

Storm DrainageSanitary SewerWater DistributionForce MainPump StationsDetention Systems
At a Glance

Underground utilities

Marks Clearing & Grading self-performs wet utility installation as a core part of its turnkey sitework scope.

Primary Scopes
Storm drainage, sanitary sewer and water distribution
Specialized
Force mains, pump stations and underground detention
Conditions
Rock, deep excavations, and wetland and stream crossings
Coordination
Sequenced with Marks grading and roadway crews
Partners
Established relationships with municipalities and inspectors
Service Area
Greater Raleigh-Durham home base, projects throughout the Carolinas
Overview

One site. Connected crews.

Underground work shapes what happens above it. Our utility teams work with the broader Marks operation to plan access, sequence installation and keep the next phase in view.

Wet utilities are a core, self-performed part of the Marks scope, not a line item we hand off. We have built strong relationships with municipalities and inspectors across Greater Raleigh-Durham and throughout the Carolinas, and our crews coordinate in the field to keep utility work moving safely and efficiently.

Two Marks Clearing and Grading utility crew members beside a shored trench box with a Marks excavator behind them
Aerial view of a Marks Clearing and Grading excavator setting storm pipe into a precast structure
Storm Drainage

The network that makes the grading plan work

RCP, HDPE, structures and stormwater conveyance.

RCP and HDPE storm systems, precast structures and outlet protection, installed in step with the grades around them.

Marks Clearing and Grading excavator digging a deep sewer trench with a trench box in place and sewer pipe staged nearby
Sanitary Sewer

Gravity lines built to spec

Gravity sewer, manholes, laterals and tie-ins.

Gravity mains, laterals, manholes and offsite tie-ins, installed to municipal specification and inspected as we go.

Marks Clearing and Grading crew member in hard hat, face shield and hi-vis vest cutting PVC pipe with a cut-off saw
Water Distribution

Ready for a clean handoff

Mains, valves, hydrants and service connections.

Water mains, valves, hydrants and services, pressure tested and disinfected for a clean handoff to the utility.

Specialized Scopes

Beyond storm, sewer and water

Aerial view of a long Marks Clearing and Grading pipe run being installed alongside a roadway

Force Main

Onsite and offsite force main runs, including long road crossings and the coordination that comes with them.

CAT excavator setting precast wet well sections for a Marks Clearing and Grading pump station

Pump Stations

Wet wells, valve vaults and pump station installs handled in house, with the deep excavation they require.

Aerial view of a Marks Clearing and Grading underground stormwater detention system install with crane and precast chambers

Detention Systems

Deep underground detention and SCM structures built to hold stormwater long after the site is turned over.

Complex Conditions

Built for what is below the surface.

Deep excavations, difficult crossings and changing ground conditions require planning and field coordination. We bring utility experience into those decisions early, before the first pipe goes in.

  • Rock planned for in preconstruction
  • Shoring and dewatering for deep work
  • Crossings coordinated with permits and inspections
Marks Clearing and Grading excavators above a shored utility trench with installed pipe and precast structures
Aerial view of a deep blasted rock excavation with a dump truck at the rim on a Marks Clearing and Grading site
01

Rock & blasting

We plan for rock in preconstruction and coordinate blasting when it is required, so one line does not hold up the rest of the site.

Long pipe run laid in a deep sloped utility trench leading to a precast structure, with a Marks crew member working at depth
02

Deep excavation

Deep sewer, wet wells and pump stations call for shoring, dewatering and crews who work safely at depth.

Marks Clearing and Grading excavator working a utility trench beside a tree line under a blue sky
03

Aerial sewer & wetland crossings

Aerial sewer over wetlands, stream crossings and sensitive buffers each come with their own permits, access limits and inspection schedule. We plan for them from the start.

Featured Project

Magnolia Forest

A 57-acre KB Home development delivering 154 homes, with mass grading, roadway widening and one of the largest utility scopes we have run on a single residential site. Storm, sewer, water and an offsite force main were installed alongside our own grading crews so no phase sat waiting on another.

26,500LF of Pipe
190,000CY Moved
57Acres
154Lots
View the Project
Aerial view of graded lots, roadways and stormwater pond at the Magnolia Forest community built out by Marks Clearing and Grading
Aerial view of site grading underway at the Magnolia Forest community for KB Home
Aerial view of sitework by Marks Clearing & Grading at the Magnolia Forest community for KB Home.
In the Field

Utility work in progress

Aerial view of a Marks Clearing and Grading excavator working a utility excavation on a wooded site
Marks excavator above a shored trench box with a ladder and a crew member at the trench edge
Marks Clearing and Grading excavators and crew working a utility excavation
Marks Clearing and Grading utility crew beside a company truck with pipe staged for installation
Trench box set in a utility excavation with a Marks excavator working beyond it
Long utility trench with a trench box and a Marks excavator bucket under a clear blue sky
Marks Clearing and Grading utility crew assembling a valve and hydrant tee on a Triangle jobsite
Questions

Utilities FAQ

What utility work does Marks Clearing & Grading self-perform?

Storm drainage, sanitary sewer, water distribution, force mains, pump stations and underground detention systems, installed by Marks crews alongside our grading and roadway operations.

Does Marks install both storm and sanitary sewer?

Yes. Our crews install RCP and HDPE storm systems and precast structures, as well as gravity sewer mains, laterals, manholes and offsite tie-ins.

Can Marks handle rock, deep excavations and difficult crossings?

Yes. We plan for rock during preconstruction, coordinate blasting when it is required, and bring shoring and dewatering experience to deep sewer, detention and pump station work.

Where does Marks install underground utilities?

Throughout Greater Raleigh-Durham and the Carolinas, working with municipalities and inspectors across the region.

Why use the same contractor for grading and utilities?

When one team runs both, utility installation is sequenced with grading and roadway work, so each phase is ready for the next and the site is not waiting on separate crews.

Let’s talk about your site.

Bring Marks into the conversation early. Tell us about the utility scope and what the rest of your project needs to accomplish.

is being added to the cart...