Magnolia Forest Sitework for KB Home
Magnolia Forest.
Dirt to delivery for 154 homes.
A 57-acre KB Home community near Raleigh, where one turnkey team handles mass grading, underground utilities, curb, asphalt and a major roadway widening.
- Total Acres
- 57
- Homesites
- 154
- CY Moved
- 190K+
- LF of Pipe
- 26.5K+
At a glance
Turnkey sitework for a 154-lot single-family community, from mass grading through utilities, curb and asphalt, run by our own crews on one schedule.
- Partner
- KB Home
- Location
- Near Raleigh, NC
- Community
- 154 single-family homesites on 57 acres
- Scope
- Mass grading, utilities, curb, asphalt, stormwater and roadway widening
- Services
- Grading, Utilities, Curb and Asphalt, Erosion Control
- Latest flight
- New asphalt and curb through graded lots (October 2026)
Three scopes. One team. One schedule.
Moving from underground utilities to curb and asphalt is the stretch of a residential job where schedules most often slip. Underground has to be tested and accepted before curb goes in, and curb has to set before paving.
At Magnolia Forest we run all of it in house. Our pipe, curb and paving crews work off one schedule and answer to the same superintendents, so when a section of underground is accepted, curb is already staged to start. For KB Home, that means finished lots on a schedule they can build against, and one number to call when something needs to move.
Raw ground to buildable lots
Every scope on this site, handled by Marks crews as one turnkey package.
Mass Grading
190,000+ CY of dirt moved for full mass grading, lot development and pond excavation.
Underground Utilities
26,500+ LF of storm, sewer and water pipe, plus an offsite force main, installed by our own pipe crews.
Curb and Asphalt
16,000+ LF of curb and 25,000+ SY of asphalt across the community’s new streets.
Roadway Widening
Widening and infrastructure improvements for future traffic, with curb, gutter, asphalt and offsite DOT tie-ins.
Stormwater
SCM ponds, erosion control and sediment basins built for long-term stormwater management.
Lot Delivery
154 single-family lots fine graded and prepared for vertical construction.
Built for the traffic that comes next.
Beyond the lots, our crews widened the road along the community to support future traffic, with new curb, gutter and asphalt and offsite DOT tie-ins.
It is part of the same turnkey package as the streets inside the community.
Ponds built for the long haul.
SCM ponds, erosion control and sediment basins, built for long-term stormwater management across the 57-acre site.
The ponds were excavated as part of the same 190,000+ CY earthwork package as the lots.
Watch the progress
Drone flights and field updates from Magnolia Forest, straight from the crews.
Utilities moving, fine grading taking shape, asphalt going down.
Friday views from Magnolia Forest for KB Home. Utilities are moving, fine grading is taking shape and asphalt is going down across the 154-lot community. Another week of progress in the dirt.
- Utilities
- Fine Grading
- Asphalt
Flight by flight
How Magnolia Forest has changed, from early clearing to finished curb and roadway.