101 Acres cleared and grinded on site
674,000+ CY of earth moved so far for mass grading and pond construction, out of 1,100,000 CY planned
55,000 LF of storm, sewer, and water utilities installed
340 Single-Family + 124 Townhomes residential lots graded and prepared for construction
Large retaining wall systems built throughout the site
Full roadway construction including curb, gutter, asphalt and stripping
Offsite road widening and waterline relocation