210,000+ CY of dirt moved for full mass grading and pond work
Over 30,000 LF of pipe installed across storm, sewer, and water
13,000 SF of retaining walls across the site
Public road construction with curb, gutter, asphalt, and DOT tie-ins
SCM pond excavation and sediment basins for stormwater management