105,000+ CY of dirt moved across clearing, grading, and pond excavation
42,700+ LF of pipe installed, including storm, sewer, water, and offsite forcemain
Offsite utility extension with over 6,400 LF of forcemain
Full erosion control, sediment basins, and pond grading
Road construction with curb, gutter, and asphalt throughout site