153,000+ CY of dirt moved, including pond, wall, and mass grading
Nearly 20,900 LF of pipe across storm, water, and sewer
31,500 CY of wall excavation and backfill for major vertical installs
SCM pond excavation with clay liner and erosion control
Full roadwork package with curb, gutter, and ROW tie-ins
8.5 acres cleared for vertical development