29 Acres cleared and grinded on site
384,000+ CY of earth moved for grading and pond excavation
48,000 LF of storm, sewer, water, and force main utilities installed
312 residential lots graded and ready for vertical construction
Pump station construction with force main infrastructure
Stormwater system including ponds and outlet structures
Offsite roadway widening and utility extensions