Chapel Ridge

Chapel Ridge might sit on just 8.5 acres, but the scope is massive. We’re building out infrastructure for 79 townhomes, moving over 150,000 CY of dirt, installing nearly 27,000 LF of pipe, and handling major wall work, pond excavation, and full road buildout—all on a tight urban footprint.

SCOPE OF WORK

Total Acreage
0
Cubic yards of dirt moved
20000
Linear feet of pipe
94000
Months
0

Key Scope Highlights

  • 153,000+ CY of dirt moved, including pond, wall, and mass grading
  • Nearly 20,900 LF of pipe across storm, water, and sewer
  • 31,500 CY of wall excavation and backfill for major vertical installs
  • SCM pond excavation with clay liner and erosion control
  • Full roadwork package with curb, gutter, and ROW tie-ins
  • 8.5 acres cleared for vertical development