Land Clearing & Grubbing Contractor, Raleigh-Durham & the Carolinas
The first move on every site.
Large-scale clearing. Our fleet. Our schedule.
Timber, brush, stumps and root mat cleared across large tracts with our own dozers, grapples, grinders and trucks, so grading can start right behind us.
Clearing & grubbing
Marks Clearing & Grading self-performs large-scale clearing and grubbing with its own fleet, crews and trucks, as the opening phase of turnkey sitework.
- Scale
- Large tracts, including 120 acres on the I-540 corridor
- Fleet
- D8R dozers, root rakes, KG blades, grapple excavators and horizontal grinders
- Processing
- Timber ground on site to cut haul off and trucks on the road
- Hauling
- Our own dump trailers and road tractors
- Control
- 100 percent in house, never brokered or subbed out
- Service Area
- Greater Raleigh-Durham home base, projects throughout the Carolinas
Clearing is where a schedule is won.
Clearing is the first work on a site and the phase that decides when everything else can start. Marks runs large-scale clearing operations with a fleet sized for tracts measured in acres, not a few lots at a time.
The whole operation is ours: the dozers, the grapples, the grinders, the trucks and the crews. Nothing about the opening phase of your project depends on a subcontractor deciding when to show up.
That is why clearing is the opening advantage of a turnkey package. We mobilize, we clear, and our grading crews are already moving in behind us.
Deep enough to move fast.
Large-scale clearing is a fleet problem before it is anything else. It takes enough machines, with the right attachments, available the week the job needs them. Ours are owned, not rented, so adding a machine on a hard week is a phone call, not a procurement exercise.
Horizontal Grinders
Timber is reduced where it stands, which cuts haul off and keeps loaded trucks off the road.
D8R Dozers & Root Rakes
D8R dozers push rock, dirt and heavy material, and root rakes pile timber, brush and stumps while leaving the soil behind.
KG Blades
Standing timber sheared at ground level across large tracts.
Grapple Excavators
Grapples stack, sort and feed timber to the grinders and load what has to leave.
Dump Trailers & Road Tractors
What leaves the site goes out on our own trucks, not an outside hauler’s.
From standing timber to a workable site
Six steps, one company, one schedule. Every step is self-performed by Marks crews on Marks equipment.
Mobilize
Machines are on the ground fast, because the fleet is ours and is not tied up waiting on somebody else to release it.
Clear
Timber and brush come down across large tracts with dozers, root rakes, KG blades and grapple excavators working together.
Grub
Stumps and root mat are pulled so the subgrade comes up clean, with nothing left in the fill to settle later.
Process on Site
Horizontal grinders reduce material where it stands, which cuts haul off, cuts cost and keeps loaded trucks off the road.
Haul and Dispose
What has to leave the site is loaded on our own dump trailers and road tractors instead of an outside hauler.
Hand Off to Grading
The site is stripped and workable, and because the grading crews are ours too, they are already behind us.
One company owns the whole clearing operation.
Marks self-performs 100 percent of the clearing operation. It is not brokered, not subbed out and not coordinated across three companies with three different calendars. Here is what that changes for your schedule.
I-540 Clearing & Earthwork
Brought on by Flatiron Dragados to clear and grub 120 acres along the future six-lane toll corridor from Rock Quarry Road to I-87/US 64/US 264. Our crews removed trees, stumps, brush and surface debris on varied terrain, preserved required buffers, maintained erosion control to NCDOT standards and kept pace with aggressive schedule milestones.
The opening advantage of a turnkey site
Clearing is the first phase of a Marks turnkey package. Every phase after it comes from the same company, so the handoffs are internal and nothing waits at a boundary.
Clearing & Grubbing
Timber, stumps and root mat out. The site opens up.
Erosion Control
Measures installed and maintained by the crews already on site.
ShapeGrading & Excavation
Cut and fill starts right behind the clearing crews.
BuildUtilities
Storm, sewer and water installed by our own crews.
FinishCurb, Stone & Asphalt
The road section, delivered on the same schedule.
Clearing in production
Clearing, grubbing and on-site processing on active Marks sites.
Clearing & grubbing FAQ
What does clearing and grubbing include?
Clearing removes standing timber, brush and surface debris. Grubbing removes the stumps and root mat below grade so the subgrade comes up clean. Marks handles both, along with on-site grinding and haul off, as part of its sitework scope.
How large a site can Marks clear?
Marks regularly clears large tracts, including 120 acres along the I-540 corridor and 101 acres at Merritt Reserve. The fleet is sized for sites measured in acres, not a few lots at a time.
Does Marks subcontract its clearing?
No. Marks self-performs 100 percent of its clearing operation with its own equipment, operators and trucks.
What happens to the timber and debris?
Where it makes sense, horizontal grinders process material on site, which reduces haul off and truck traffic. What has to leave the site is hauled on Marks dump trailers and road tractors.
Can grading start right after clearing?
Yes. Clearing, grading, utilities and paving all come from the same company, so Marks grading crews move in behind the clearing without waiting on a separate contractor.
Where does Marks perform land clearing?
Throughout Greater Raleigh-Durham and the Carolinas, from our headquarters in Wendell, North Carolina.
Talk to Marks about clearing your site.
Share your acreage, plans and schedule. We will show you how fast our fleet can get the whole project moving.