SCOPE OF WORK

Total Acreage
0
Cubic yards of dirt moved
20000
Linear feet of pipe
94000
Months
0

Key Scope Highlights

418,000+ CY of dirt moved – mass excavation, backfill, pond grading, and retaining wall prep.

Nearly 100,000 LF of pipe – spanning storm, sewer, water, forcemain, and testing.

Massive underground infrastructure including:

  • Full sanitary sewer system with over 85 manholes.
  • Pump station with a $1.6M wet well, force main, air release valves, and bore/jack crossings.

Roadwork & Right-of-Way Upgrades:

  • Widening of Mitchell Mill and Rolesville including asphalt milling, storm upgrades, and full ROW restoration.
  • DOT structures like catch basins, junction boxes, FES and curb & gutter across main corridors.

Extensive pond and SCM systems:

  • 7 sediment control basins with baffles, risers, skimmers, and emergency spillways.
  • Over 52,000 CY of pond excavation.

13 retaining walls totaling nearly 15,000 SF of vertical face.